PE! Shower Remodel! Supplies! Park! 2.17.25
I came in #2 in the Finals.
OYB!
Last day for the old bathtub/shower. It did its job. Wasn’t crazy about the tile leaking.
Jessi had a good time with the girls this morning.
Roberto and Anderson came to my house around 9:00 AM and did the tear out of the old tile and tub.
Took KPE to Bojangles for biscuits. Yum. Went to Home Depot to make sure the shower kit was in. It was and they had it at the front when we got there.
I came back to Home Depot with the men to load up the shower kit.
I was glad that the ceiling I put up could be accessed easily. They had to make some adjustments from below.
Took the girls to the library and baseball park.
Set up Apple Cash.
The walk in shower was really hard to get in place. The door was holding it up. I grabbed the door frame and pulled it back as hard as I could while they wedged the bottom section in.
What a job. There were several times today I came in really helpful. Getting it down off the truck also took three people.
The girls really enjoy the hammock.
Little bit of a slow start on Duolingo for me this week. Had a LOT going on with the shower remodel and the grandgirls at the house. Hard to juggle those jobs. Still within striking range of the leaders for sure.