Whirlwind Missions

Wednesday, January 15, 2014

VA Tech! Asian Square!

Tim A. Cummins @ 10:10 pm  

Ashley and I had fun with our team from Virginia Tech. We really enjoy working with college students.
a
d
d
We showed them CD Tower, Pho Da and Sweet Hut in Asian Square on Buford Highway.
s
s
After lunch, the team worked on decorating bags with John 3:16 and hearts for a Valentine outreach.
t

Ashley and I check on paint supplies and figured out how much we’d need to do the project.

They’re working on the mission at Huntington Terraces and finishing up at the mission at Azalea.

I met with a roofer this evening at my house. I have a section of my roof that needs repair.

Feeling a little bit under the weather. Scratchy throat, kinda tired.

Admin duties now.

Comments are closed.